Share This

Wednesday, 10 January 2018

Penang Transport Master Plan (PTMP) - Tunnel project rocked, Directors arrested in graft probe

https://www.youtube.com/watch?v=6B9o1baUaP8

https://youtu.be/VL98vA4I2gE

Stalled ambition: A view of the Gurney Drive seafront, which is meant to be connected to Bagan Ajam in Seberang Prai under the Penang undersea tunnel project.
The RM6.3bil undersea tunnel project in Penang is on rocky ground with the MACC going on a day-long swoop on companies and state government agencies involved. A high-ranking Datuk in one of the companies has been detained to help in investigations into allegations of corruption in the long-delayed mega project and feasibility studies.

PETALING JAYA: Graft-busters have arrested a Datuk holding a high post in a company involved in the controversial Penang undersea tunnel project to help investigations into corruption claims.

The arrest came after a day-long massive swoop on several offices in Penang, where the Malaysian Anti-Corruption Commission (MACC) seized documents related to the RM6.3bil mega project.

The anti-graft agency raided the offices of four state government agencies – the Penang Public Works Department, Penang State Secretary, Penang Office of Lands and Mines and Penang Valuation and Property Services Department – and three property development and construction companies – Ewein Zenith Sdn Bhd, 555 Capital Sdn Bhd and Consortium Zenith Construction Sdn Bhd’s Penang office.

MACC officers also questioned several officers in charge of the respective agencies and companies since the raids began yesterday morning.

Sources familiar with the investigation said the probe into the undersea tunnel project was also zooming in on land swaps.

Ewein Zenith is a joint-venture vehicle of Ewein Land Sdn Bhd and Consortium Zenith BUCG Sdn Bhd.

The latter is a Malaysia-China joint venture that was awarded the RM6.3bil mega project to build the 7.2km undersea tunnel connecting Gurney Drive on the island to Bagan Ajam in Seberang Prai, a 10.53km North Coastal Paired Road (NCPR) from Tanjung Bungah to Teluk Bahang, the 5.7km Air Itam–Tun Dr Lim Chong Eu Expressway bypass and the 4.075km Gurney Drive–Tun Dr Lim Chong Eu Expressway bypass.

Consortium Zenith BUCG changed its name to Consortium Zenith Construction Sdn Bhd on Jan 18 last year after the withdrawal of Beijing Urban Construction Group (BUCG).

It is believed that the MACC is looking into why the state government allowed the Penang Tunnel special purpose vehicle (SPV) company to pre-sell state land rights worth RM3bil despite a four-year delay in the construction of roads.

Investigators are also believed to be looking into the RM305mil feasibility and detailed design studies that have yet to be completed, even though a payment of RM220mil was made to the SPV.

On Oct 11 last year, the main contractor of the project announced that there was no urgency to finish the feasibility study for the undersea tunnel, as it was only set to begin in 2023.

The feasibility study of the tunnel started in February 2015 and as of October last year, it was said to be 92.9% complete.

Works Minister Datuk Seri Fadillah Yusof has said the delay in submitting the feasibility report to him was very unusual considering that the project was awarded in 2013.

On Friday, Parti Cinta Malaysia (PCM) vice-president Datuk Huan Cheng Guan lodged a report at the MACC headquarters in Putrajaya and handed over documents which he claimed contained new evidence of corruption in the project.

It was Huan’s third report about the matter. He first lodged a police report on July 17 last year, claiming that the project was awarded to an “undercapitalised” company.

He then lodged a report with the MACC on July 21, calling for a corruption probe.

In George Town, a source in the MACC confirmed that they had ­visited the offices of Ewein Zenith, Consor­tium Zenith Construction and 555 Capital, all of which are involved in the Penang undersea tunnel project.

“We went in the morning, shortly after their offices opened,” said the MACC officer.

However, none of the senior management staff were in and only the front office and sales staff were present to attend to them.

State Works Committee chairman Lim Hock Seng said he was not aware of the raids, while Consortium Zenith senior executive director Datuk Zarul Ahmad Mohd Zulkifli could not be reached for comment.

Meanwhile, state secretary Datuk Seri Farizan Darus said the National Economic Planning Unit on the 25th floor of Komtar was also raided, but declined to give details.

Huan thanked the commission for acting on his report.

“I believe the MACC will carry out its investigation professionally without any fear or favour,” he said.

The MACC is expected to hold a press conference today to explain the spate of raids and provide updates on the investigations.

By royce tan, tan sin chow, r. sekaran, cavina lim The Star

No comments:

Post a Comment

Rightways