Share This

Showing posts with label Transport. Show all posts
Showing posts with label Transport. Show all posts

Tuesday 22 January 2019

Penang bridge tragedy raises many questions

Family shows strength in Moey's death - Nation

  https://youtu.be/nkSSSs7KUMA
https://youtu.be/ooueh3PMZTs

Penang Bridge Rescue Mission Resumes Today. Here's All You Need ...


Driver of black car detained, then released on bail after 16 hours ...

 

  https://youtu.be/tohf5ijbtq4



How to escape a sinking car?
 
https://youtu.be/xJ8OJ2s7Sq4

GEORGE TOWN: The tragic crash on Penang Bridge, which saw a student killed after his car plunged into the sea, has raised a thousand questions.

Online commenters questioned the height of the railings, whether there should be a curfew for those aged above 18 as well as the need for responsible drinking.

Facebook user Asger Abdul Wahab questioned the height of the railing, on which people had stood to jump and commit suicide in the past.

“If the side railings weren’t low, at least the vehicle could have landed on the side of the bridge instead of going over the bridge,” he said.

For Sanush Jeyaratnam, the tragedy highlighted the need for a curfew, as suggested by the government, for those aged 18 and below.

One comment stated that those aged 21 and below should not be out after midnight without adult supervision.

Another Facebook user said the accident did not mean that alchohol consumption should be stopped as it was all about responsible drinking.

Junior Chamber International (JCI) George Town charter president Kyara Ng said the disaster sparked a discussion among their group members, who are aged between 21 and 26.

“I think there is a great need to continue to create more awareness about accidents linked to driving under the influence,” she said.

Defensive driving trainer K.G. Nah noted that when the driver in the black car on Penang Bridge overtook from the left, he went into an “oversteer situation” and all of the car’s weight was transferred to the front tyres.

“In an oversteer, even a trained race car driver will have trouble controlling the vehicle at high speeds,” he said.

He explained that when the rear tyres no longer hold the weight of the car, they lose traction and can no longer follow the lead of the front tyres, causing the car to skid out of control.

Another term for cars in this situation is “tail happy”.

Nah, who received a copy of the dashboard camera footage of the crash, said he watched it frame by frame but could not see the brake lights come on behind the black car until it crashed into the sports utility vehicle (SUV).

“For the car to go into an oversteer without evident braking, it was going at an incredibly high speed,” he added.

As for the SUV, Nah said it was tragic that it was hit in the rear left passenger door.

“Any car slammed in the rear flank will spin out of control and at that speed, the car flipped with enough force to roll over the bridge parapet and fall into the sea,” he added.


Related:


SUV hoisted out of sea off Penang Bridge | Free Malaysia Today



 

Penang bridge crash: SUV wreckage found with body of 20-year-old ...

 

Penang bridge crash: Wreckage found in sea with body of 20-year-old ...


 Wreckage found with body inside
 

https://www.thestar.com.my/news/nation/2019/01/22/wreckage-found-with-body-inside-but-strong-currents-and-poor-visibility-delay-suv-retrieval-efforts/?jwsource=cl

Thursday 18 October 2018

Golden opportunity for DAP leaders to practise what they preached


In May this year, we voted for a change of government at both state and federal levels after 61 years of suffering under the yoke of Umno and its partners. We voted for hope and change.

The Pakatan Harapan (PH) parties went from being in the opposition to becoming the government of the day. When they were opposition politicians they could only voice their objections and concerns. But today they are in power to carry out what they hoped and fought for. Are they carrying out the trust that we placed in them?

Let us examine this in relation to the biggest project confronting the people of Penang (also one of the largest mega projects in Malaysia): the RM46 billion Penang Transport Master Plan (PTMP), and more immediately, phase 1 of this plan – the proposed Penang Island Link 1 (PIL 1) and the LRT project. The PIL 1 is an extension of the aborted Penang Outer Ring Road (PORR).

What did our present Chief Minister Chow Kon Yeow say when he was the opposition MP in 2002? “If the findings of the Halcrow Report are true, Dr Koh would be irresponsible in pushing the PORR through as this will not be a long-term solution to the traffic congestion on the island…”

There were two other minor reasons why Chow opposed the PORR: because it was a tolled road and no open tender was used to award the project. But these cannot be the main reasons for opposing it.

And what did Lim Kit Siang say on May 28, 2002?

“The nightmare of the Penang traffic congestion is likely to be back to square one, not in eight years but probably less than five years, after the completion of PORR.

“What Penang needs is an efficient public transport system based on sustainable transport policy, as PORR is not a medium-term let alone long-term solution to the traffic congestion nightmare on the island.”

Since these two DAP leaders could not be clearer on why they opposed construction of the PORR as it would not solve traffic problems, how does Chow now justify the PIL 1?

According to the environmental impact assessment (EIA) of the PIL 1, the consultants reported that by 2030 (between five and seven years after completion of PIL 1), traffic volume will reach up to 8,000 pcu/hour (passenger car unit) during evening peak hours.

Translated into layman’s terms, we would be back to square one in terms of traffic congestion. This was exactly what the transport report of 1998 by international consultant Halcrow said of PORR. Back then, Chow asked Koh Tsu Koon (then Penang’s chief minister) to disprove Halcrow’s findings. Today we ask Chow the same question.

Public policy must be based on scientific study, analysis and evidence, not on whims and fancies. (That is why the Penang state government funds the Penang Institute to provide sound policy analysis and advice.) If the EIA’s conclusion is that the PIL 1 will not solve traffic congestion in the medium and long term, then the chief minister must justify to the people of Penang on what other grounds he based his decision to spend RM8 billion on one highway that will not solve Penang’s traffic congestion and is fraught with safety risks, on top of financial, environmental, social and health costs. How should he explain his volte-face?

Lim Kit Siang made it clear that the only alternative is to have an efficient public transport system. This is a golden opportunity for these leaders to implement what they preached. The chief minister said at a town hall meeting on Sept 20 that the state is proposing a balanced approach to solving the transport problem: building roads and public transport.

Let us examine the actual facts.

1. Penang island presently has 2.8 times more highways on a per capita basis than Singapore (84m per 1,000 persons in Penang versus 30m per 1,000 persons in Singapore).

2. The state government under the PTMP is planning to build another 70km of highways, many of them elevated, marring the city landscape and thereby doubling our highway per capita to 4.5 times that of Singapore.

3. Presently Penang’s public modal share of transport is dismal at 5%, i.e., only 5% of people who travel use public transport, compared to 67% in Singapore.

From the above, it is clear that Penang’s transport situation today is totally tilted towards roads and against public transport. Hence a balanced approach must mean prioritising improvement of public transport and not the construction of more highways that encourage more private road use.

The primary objective of the PTMP is to raise public modal transport share to 40% by 2030. But spending RM15 billion on building highways in the first phase of the PTMP (RM8 billion on PIL 1 plus RM6.5 billion on the three paired roads and tunnel under the Zenith package) and RM8 billion on one LRT line is NOT a balanced approach.

In fact, under the Halcrow PTMP, an integrated public transport network consisting of trams, bus rapid transit, commuter rail and a new cross-channel ferry service was estimated to cost RM10 billion. But all these are shelved or relegated to future dates while priority is given to building highways. The chief minister must explain to the people of Penang why such an unbalanced approach is adopted. Is the policy based on scientific evidence or on other types of interests that we are unaware of?

The saying that “justice must not only be done but must be seen to be done” aptly applies in this case. The people of Penang must have clear and credible answers to dispel any possible misgivings.

I respect and have worked with Chow for the last 10 years on the Penang transport issue.

I recall what he told Koh: that if the findings of the EIA report are true then Koh would be irresponsible in pushing the PORR.

Now, in the case of PIL 1, the arguments are even stronger that this will not be a long-term solution to the traffic congestion on the island.

Source: FMT by Lim Mah Hui

Lim Mah Hui is a former professor, international banker and Penang Island city councillor.

The views expressed are those of the author and do not necessarily reflect those of FMT.

Related posts:

New mode of public transport, the ART (Autonomous Rail-Rapid Transit) for Penang, wait no more !

 

Penang Forum calls to review Penang mega projects

 

Penang new Chief Minister taking Penang to the next level

 

 Go-ahead likely for Penang LRT

 

Penang Island City Council, MBPP councilor Dr Lim fed up change not happening in Penang

 

 Penang Transport Master Plan (PTMP) - Tunnel project rocked, Directors arrested in graft probe

 

Penang's eight transport plans unfulfilled, Not even one commenced work, says Teng


Rage against hill road plan: We don't want that road, says Penang residents 

 

Penang undersea tunnel developer CZC 'duped into paying RM22mil' at gun point?

 

Penang undersea tunnel project scrutinized by the Malaysian Anti Corruption Commission (MACC) 

 

PTMP: Losses making fashion company in Penang Undersea Tunnel Project

 

Tough questions on Penang turnel project; Engineering Consultant arrested in probe

Monday 15 October 2018

Bukit Kukus paired road hits snag before mishap, stop work order to contractor on collapsed beams

Precarious situation: The collapsed beams along Jalan Tun Sardon which fell and broke after being knocked down.

https://www.thestar.com.my/news/nation/2018/10/14/stop-work-road-contractor-told-dosh-to-look-at-work-sites-procedures-after-mishap/?jwsource=twi

Stop work, road contractor told


BALIK PULAU: The contractor of the 600m elevated road project linking Jalan Bukit Kukus to Jalan Tun Sardon here has been issued with a stop-work order.

The order came following a mishap on the site where 14 concrete beams measuring 25m each fell onto a slope in Jalan Tun Sardon on Thursday.

Eleven beams broke apart in the 8.30pm incident. However, no injuries were reported.

It is learnt that a crane operator accidentally knocked down one of the beams laid on the ground, causing others to fall onto the slope like dominoes.

Penang Department of Occupa­tional Safety and Health (DOSH) director Mohd Rosdee Yaacob said the contractor had been instructed to be present at the DOSH office tomorrow for a meeting.

“We are reviewing the standard operating procedures at the work site.

“For now, the contractor is not allowed to load and unload other concrete beams,” he said yesterday

Mohd Rosdee said his officers were only sent to the site on Friday as they were not immediately informed of the incident.

State Works Committee chairman Zairil Khir Johari said the contractor had been told to prepare a full report for DOSH.

He said the Penang Island City Council (MBPP) would also initiate an internal inquiry tomorrow.

The construction of the elevated road, together with the upgrading of a 1.1km stretch along Lebuhraya Thean Teik and a 1.5km stretch along Lebuh Bukit Jambul, is a MBPP project costing RM275.6mil and is scheduled for completion early next year.

The three segments are part of the project for the construction of the RM545mil alternative road – Jalan Bukit Kukus – to help ease traffic snarls along Jalan Paya Terubong, which is an arterial road linking Bayan Baru, Balik Pulau and Air Itam.

The construction works involve linking Lebuhraya Thean Teik in Bandar Baru Air Itam and Lebuh Bukit Jambul in Penang via Jalan Bukit Kukus, building an elevated U-turn along Lebuh Bukit Jambul for those who want to make a turn and go back to Relau. - The Star

Paired road already hits snag

Slow path ahead: The elevated road near Jalan Paya Terubong in Penang will not be ready for another two years.
GEORGE TOWN: Work on the RM545mil Jalan Bukit Kukus paired road project has hit a snag even before the construction mishap in Jalan Tun Sardon.

The completion date on the project, an alternative road linking Lebuhraya Thean Teik in Bandar Baru Air Itam to Lebuh Bukit Jambul, will be delayed by a year till mid-2020 due to unforeseen obstacles during construction.

State Works, Utilities and Flood Mitigation committee chairman Zairil Khir Johari, in describing the project as “very complicated”, said it was constructed by three parties as a cost-saving measure.

“The Penang Island City Council (MBPP) will construct 2.8km of the stretch, while PLB Land Sdn Bhd and Geo Valley Sdn Bhd will construct the remaining 1.4km and 0.7km respectively,” he said.

Zairil said while the three parties involved in the works faced various issues resulting in the delay.

“For example, the MBPP which is working on the 2.8km stretch costing RM275.6mil, faced a delay due to land acquisition issues, realignment and relocation of cables.

“The project is 69% done and to be completed by early 2020.

“PLB Land faced issues with big rocks and boulders. The RM150mil section has progressed 36% and scheduled for mid-2020,” he said.

Zairil said that Geo Valley faced legal issues as the residents affected by their section of the project took up matters with the Appeals Board and the case was pending.

The RM120mil stretch by Geo Valley is now 18% completed.

“Once PLB and Geo Valley complete their portions, we will connect them accordingly,” he said.

It was earlier reported that the contractor of the 600m elevated road project linking Jalan Bukit Kukus to Jalan Tun Sardon was issued with a stop-work order.

The order came after a mishap on the site where 14 concrete beams measuring 25m fell onto a slope in Jalan Tun Sardon on Thursday. No injuries were reported.

It is learnt that a crane operator accidentally knocked down one of the beams laid on the ground, causing others to fall onto the slope.

Paya Terubong assemblyman Yeoh Soon Hin hopes that there will be no further delays.

“About 60,000 vehicles use Jalan Paya Terubong daily to get to Bayan Lepas, and traffic congestion is bad during peak hours.

“I hope the project will be completed safely according to specifications and on schedule for the people to use,” he said.

Once the alternative route is completed, traffic is expected to see a reduction of at least 30%.

The new link will comprise a dual carriageway with a bicycle lane, walkway and LED street lights.

A small waterfall on the hill will also be retained and construction would go around the waterfall.

Last month, MBPP mayor Datuk Yew Tung Seang said the construction on the paired road would take up RM44.2mil of the council’s budget next year. - The Star by Lo Tern Chern



Related:



Dosh: Stop-work order on elevated road project stays 



Public talks heading nowhere - Metro News

 

Penang Forum wants eco-review of PIL 1



The Tips and Procedures for Issuing a Stop Work Order


2 Things You Should Never Say To A Contractor - Residential ...




Related posts:



ART - Can be completed within 1 year for Penang lang, wait no more ! 年内就可以通车。槟城人,要不要?! The ART (Autonomous Rail-Rapid Transit) was nomi...


Penang bald Hillslopes a "time bomb"

 

Penang Paya Terubong Residents living under shadow of fear!

 

PAC blamed Penang Island City Council (MBPP) for failing to enforce laws on hillside development 

 

IJM hill clearing & Trehaus construction damaged nearby houses since 2014 must be mitigated quickly

 

Thursday 31 May 2018

Malaysia's scraps MRT3 project, reviews HSR, ECRL mega projects to reduce borrowings

https://youtu.be/kAGJvuDRi5M  https://youtu.be/zJ8m_yMIJwg https://youtu.be/2FWWQTdszeo https://youtu.be/i2XEugxWl9A

https://youtu.be/w-GjTOUPy6U

PUTRAJAYA: The Klang Valley mass rapid transit line 3 (MRT 3 or Circle Line) project, reported to cost between RM40bil and RM45bil, will not proceed, says Prime Minister Tun Dr Mahathir Mohamad.

The MRT3 or MRT Circle Line was planned as the third MRT line for the Greater Klang Valley area.

While the MRT1 connects Sungai Buloh and Kajang, the MRT2, which is now under construction, will run from Sungai Buloh to Serdang and Putrajaya.

MRT3 was planned as a loop line to integrate the lines, with most of its stations underground.

He also said the Kuala Lumpur-Singapore High-Speed Rail (HSR) was still being studied, while a review was being done on the East Cost Rail Link (ECRL).

He said Malaysia was open to re-considering its decision on the HSR if Singapore could convince Malaysia to proceed with it.

He said the Cabinet had agreed for the rail project to be scrapped, but it would also depend on discussions with Singapore.

“We want to do this as it has high financial implications. But we will listen to them (if Singapore wants to proceed). They are our good partners,” he told the media after chairing the Cabinet meeting yesterday.

He explained that Malaysia needed to reduce its borrowings, hence the decision to scrap HSR and review other mega projects that cost billions of ringgit.

“We have borrowed too much money. If this country is to avoid bankruptcy, we must learn how to manage our big debts by doing away with projects that are not beneficial to the country,” he added.

Later, at a buka puasa event at Putrajaya International Convention Centre, he said the money spent on the HSR project did not justify the number of jobs it could generate.

“If you are going to spend RM60bil to RM100bil so that thousands of people can work, that’s not very efficient,” he said in response to a Facebook post by former prime minister Datuk Seri Najib Tun Razak, who defended the HSR.

Najib, who asked the Government not to make “an emotional decision” to scrap the project, said the HSR was projected to create RM650bil in gross national income and 110,000 job opportunities, which could expand to 442,000 jobs by 2069.

On the fate of the ECRL, Dr Mahathir said the project has not been called off and a detailed review was being conducted.

“We haven’t cancelled ECRL. We have spent a lot of money on it and need to look at ways to handle this matter,” he said.

According to recent reports, the actual cost of the ECRL could be more than RM55bil.

Dr Mahathir also said the 11th Malaysia Plan mid-term review would be tabled in Parliament in November along with Budget 2019.

“The review will take into consideration the progress of projects carried out from 2016 to 2018, and the Government’s way forward for the remaining period of between this year and 2020,” he added.

Parliament is expected to start its meeting next month, but Dr Mahathir said the dates had yet to be fixed since the appointment of ministers had not been completed.

On whether the Cabinet had decided on the fate of the National Civics Bureau (BTN), he said the matter was still being studied.

The Prime Minister also said no decision had been made on whether the Department of Islamic Develop­ment (Jakim) would be closed.


Related post:


Chinese projects in Malaysia may stay intact

Newly-elected Malaysian Prime Minister Mahathir Mohamad has decided to scrap the Kuala Lumpur-Singapore Rail




SST implementation date among key decisions made by Cabinet
 https://www.thestar.com.my/~/media/online/2018/05/16/04/35/1mdba.ashx/?w=620&h=413&crop=1&hash=ECE23B276AA140BA80725A657A4FE4303340DA4A

Wednesday 3 August 2016

Why have US tech giants Uber sunk in China? Its legal status, plans in Asia



https://youtu.be/jndu38nTQaA

China's ride-hailing service Didi Chuxing on Monday announced a strategic deal with Uber China. Under the agreement, Didi Chuxing will acquire all assets of Uber China including its brand, business operations and data. Didi will also obtain a minority equity interest in Uber.

The acquisition has sparked strong reactions among the US and other Western media. They portrayed the deal as "Uber's surrender" to Didi, repeating the failures of other American high-tech firms in China.

An article in The New York Times claimed that over the last couple of decades, Amazon, Facebook, Google and other American technology giants, like an imperial armada, rolled out from North America's West Coast, to "try to establish beachheads on every other continent. But when American giants tried to enter the waters of China, the world's largest Internet market, the armada invariably ran aground."

The US media advocate that China's problem is largely to blame for the sinking of the American high-tech armada. According to them, the Internet has been divided into two parts - the Chinese Internet and the Internet of the rest of the world. The Chinese Internet lacks transparency and is subject to the government supervision. Only homegrown firms can adapt to it.

The Internet does have its own supervision system, but the supervision is fair to both local and foreign companies. US Internet giants are at the helm of networking technology development, while Chinese homegrown companies as a whole still lack the ability to lead the industry. As the US firms are naturally in an advantageous position, what makes domestic Chinese firms triumph over them?

Despite starting by imitating US companies, Chinese Internet giants have based themselves on China's realities. They not only have extensively made technical innovations in accordance with the demands of Chinese users, but also adapted their business modes to the Chinese market and other non-market factors. But when US firms operate in China, they often confound the core pursuits of Chinese users.

Take Google. Bound by values and emboldened by support from netizens who are well-disposed toward the West, Google had developed the ambition to transform China. But it made a strategic misjudgment of the Chinese market. When it was squarely at odds with the Chinese government, it didn't have support from the majority of Chinese netizens.

With growing strength, China's local Internet companies are becoming more confident and their employees are more industrious. All these add to their chances of defeating foreign competitors.

Apart from the Internet industry, foreign enterprises are also facing fiercer competition from their local rivals. The vitality of China's own business is being continually unleashed. If foreign companies want to win in the Chinese market, they have to invest more efforts. Don't use politics as an excuse for their failures. It won't be of any help. - Global Times

Legal status of app-based ride-sharing a new start


A Chinese mobile phone user uses the taxi-hailing and car-service app Didi Chuxing on his Apple iPhone smartphone in Jinan city, east China's Shandong province, Feb 22, 2015.[Photo/IC]


https://youtu.be/tWC74SRSgsk

Customers love them, because private transportation has never been this convenient, efficient, and accessible.

Taxi drivers oppose them, because their rapid expansion and popularity have resulted in conspicuous customer drain for the traditional taxi market.

Government regulators find them concerning, because they do raise questions about safety, fairness and legitimacy. Not to mention, they do not fit into any existing regulatory framework.

Which is why mobile app-based ride-sharing services, such as Uber and various indigenous cousins, have found themselves in a largely undefined gray zone.

In Beijing, for instance, where Uber and its Chinese look-alikes have grown phenomenally, contracted drivers have been operating in stealth mode for fear of heavy fines.

But despite all the complaints, resistance, even bans in some places, Uber and similar services have continued mushrooming and prospering.

The popularity of app-based ride-sharing has a lot to do with dissatisfaction with taxi services in the pre-Uber days.

In China, however, it goes far beyond a more pleasant user experience. Multiple recent surveys have highlighted the new services' role as job creator.

Uber and its local peers have reportedly become an important income provider for workers displaced in the process of reducing industrial overcapacity. One survey even reported that being a contracted driver for Uber or a similar ride-sharing service provider is the only source of income for more than half of the workers laid off recently in the coal and steel industries.

Given the obvious loopholes in operation and management of such services, especially with regard to driver certification, security guarantees and taxation, it is certainly necessary to regulate the industry.

But an all-win, all-happy solution is difficult to arrive at precisely because such services are too new, too complicated for regulators.

The authorities made a daring, respectable move on Thursday by giving app-based ride-sharing legal status and introducing standards for the new sector.

Yet although it has been reviewed and revised repeatedly based on feedback from the public, the regulatory regime unveiled still needs further research and clarification.

The stipulations show plenty of thought has been given to key problems surrounding the brand-new business model. But they do display the inclination to include the new services into regulators' modus operandi, and render them another part of the traditional taxi service market.

Such an inclination may undermine the otherwise promising prospects of something the public clearly wants. - China Daily

Uber plans to boost resources in SEA, India


Out of China: A man walks past an Uber station outside a shopping mall in Beijing. Didi Chuxing said on Monday it will buy Uber’s operations in China, putting an end to a year-long war between the world’s two largest ride-sharing companies. — AFP

This comes after sale of China ops to Didi Chuxing

SINGAPORE: Uber Technologies Inc will redeploy 150 engineers from its China operations to other key markets such as Southeast Asia after agreeing to sell its business in the world’s most populous nation, according to people with direct knowledge of the plan.

The San Francisco-based employees will develop new features such as mapping as it boosts services for the region that includes Singapore, Thailand and Indonesia, the people said, asking not to be identified as the matter is private.

Didi Chuxing said on Monday it will buy Uber’s operations in China, putting an end to a year-long war between the world’s two largest ride-sharing companies.

The China deal will also allow Uber to free up capital to double down on putting resources into other markets and hire more engineers locally in India, the people said. Uber has a total global workforce of about 8,000, spanning engineering, marketing and operations. Uber declined to comment.

Uber’s shift is a sign it won’t let up in its battle for customers elsewhere in Asia even after reaching a peace deal for China.

The world’s most valuable startup competes with Singapore-based Grab for ride-hailing customers in South-East Asia, a region that also includes Malaysia and Vietnam, while also tackling Go-Jek in Indonesia and going head-to-head with Ola in India.

Didi is in an alliance with Grab, Old and Lyft Inc. that unites four rivals to Uber. It’s not clear what impact the China deal will have on that alliance.

Grab chief executive officer Anthony Tan sent an internal memo to employees yesterday, reassuring them Didi’s victory showed that local companies are better positioned for dominance of the local market and he expected Uber to put more resources into the region.

Grab operates in 30 cities across six countries. Having raised more than US$15bil and valued at US$68bil, Uber has a long bench of investors from venture capitalists and hedge funds to sovereign wealth funds.

Since its inception in 2012, Grab has raised at least US$680mil, based on disclosed information, with investors including Vertex Venture Holdings Ltd, Tiger Global Management LLC, Hillhouse Capital Management Ltd, SoftBank Group Corp, China Investment Corp and Didi.

Under the Didi deal, Uber and its backers will have a 20 percent economic interest in China’s largest ride-sharing company. — Bloomberg

Related post:

Dec 5, 2014 ... Uber doesn't break out user numbers, but GrabTaxi — which says it is leading the taxi app space in Southeast Asia — claims 500,000 monthly ...

Thursday 7 April 2016

Lighthouse in South China Sea is operating now

The lighthouse on Zhubi Reef in the South China Sea is now in use. XING GUANGLI / XINHUA


China turns on lighthouse on man-made island

China's Ministry of Transport on Tuesday held a completion ceremony for the construction of a lighthouse on Zhubi Reef, marking the start of its operation.

Beijing rebuffed suspicion on Wednesday over the operation of a lighthouse on an island in the South China Sea, saying it is a public service that China is providing to the region.

"China has been committed to providing more public products and services to navigation in the South China Sea. It is beneficial to the trade of coastal countries in the region and even some countries outside the region," Foreign Ministry spokesman Lu Kang told a regular news briefing.

The Ministry of Transport held a completion ceremony on Tuesday for construction of the lighthouse on Zhubi Reef, marking the start of the lighthouse's operation.

Construction of the 55-meter-high lighthouse, which has a lantern of 4.5 meters in diameter on top and rotating lights inside, began in October. The lighthouse is monitored via a remote control terminal.

The lighthouse emits white light in the nighttime, with a range of 22 nautical miles and a glow cycle of five seconds.

Zheng Heping, deputy head of the Maritime Safety Administration, said the automatic identification system and other equipment inside the lighthouse can provide efficient navigation services to ships, such as positioning reference, route guidance and navigation safety information.

To improve maritime emergency responses in the area, the Ministry of Transport started construction of large, multifunctional lighthouses on Huayang Reef, Chigua Reef and Zhubi Reef last year. The two other lighthouses are already in use.

"The Zhubi lighthouse will further enhance the capability to ensure maritime security in the South China Sea," Zheng said.

"The lighthouse is a very advanced one with multiple functions," said Zhang Xuegang, an expert on Southeast Asian studies at the China Institutes of Contemporary International Relations.

He said the lighthouse will provide information about hydrology and weather, including typhoon warnings, to passing vessels.

"It can also provide waterway information, such as which channels are busy," he added.

He suggested having rescue personnel live on the island.

Li Jinming, a professor of maritime policy and law at Xiamen University, said the lighthouses that China has built in the South China Sea are a testimony to its efforts to safeguard navigation freedom and security.

"The US, Japan and the Philippines have challenged China on that. And the glowing lighthouse is a silent answer."

Lighthouses are part of China's efforts to perform its responsibilities in maritime search and rescue, response to natural disasters and marine environmental protection, the Transport Ministry has said.

By Li Xiaokun China Daily/Xinhua

Thursday 6 August 2015

MH370: Aircraft debris found on La Reunion is from missing Malaysia Airlines flight

Malaysian Prime Minister Najib Razak (C) attends a press conference on the missing Malaysian Airlines flight MH370 in Kuala Lumpur, Malaysia, Aug. 6, 2015. Verification had confirmed that the debris discovered on the Reunion Island belongs to the missing Malaysian Airlines flight MH370, Malaysian Prime Minister Najib Razak announced here early on Thursday. (Xinhua/Chong Voon Chung)



KUALA LUMPUR, Aug. 6 (Xinhua) -- Verification had confirmed that the debris discovered on Reunion Island belongs to missing Malaysian Airlines flight MH370, Malaysian Prime Minister Najib Razak announced early Thursday.

"Today, 515 days since the plane disappeared, it is with a heavy heart that I must tell you that an international team of experts have conclusively confirmed that the aircraft debris found on Reunion Island is indeed from MH370," the prime minister said.

"We now have physical evidence that, as I announced on 24th March last year, flight MH370 tragically ended in the southern Indian Ocean," Najib said.

"This is indeed a major breakthrough for us in resolving the disappearance of MH370. We expect and hope that there would be more objects to be found which would be able to help resolve this mystery."

The airlines will update the families and cooperate with the authorities, he added.

The prime minister said his country remains dedicated to finding out what had happened on board the flight. "I would like to assure all those affected by this tragedy that the government of Malaysia is committed to doing everything within our means to find out the truth of what happened."

Meanwhile, the Malaysia Airlines said the finding had been confirmed jointly by the French Authorities, the French Bureau of Enquiry and Analysis for Civil Aviation Safety (BEA), the Malaysian investigation team, the technical representatives from China and the Australian Transportation Safety Bureau (ATSB) in Toulouse, France.

The debris was discovered on Reunion Island on July 29 and was officially identified as part of a plane wing known as a flaperon from a Boeing 777.

Prior to the latest discovery, a massive surface and underwater hunt had failed to find the plane in what has become one of the biggest mysteries in the aviation history.

The plane went missing on March 8, 2014 en route from Kuala Lumpur to Beijing with 239 on board, most of them Chinese. - Xinhua

  1 2 3 4 5 6 7 8   

Related: 





Related post:




Video: http://edition.cnn.com/2015/07/30/world/mh370-debris-investigation/   Saint-Denis, Reunion Island (CNN) Wh...

Saturday 1 August 2015

MH370 Debris found in Reunion may give clues on when plane part broke

The pilots of Malaysia Airlines Flight 370 are Forst Officer Gambar Fariq Abdul Hamid, left, and Captain Zaharie Ahmad Shah at right.

lkl coren mh370 malaysia airlines ceo yahya_00004318.jpg
malaysia flight 370 all lives lost mg orig_00010727.jpg
mh370 victim families lklv ripley _00005216.jpg

A policeman and a gendarme stand next to a piece of debris from an unidentified aircraft found in the coastal area of Saint-Andre de la Reunion, in the east of the French Indian Ocean island of La Reunion, on July 29, 2015. The two-metre-long debris, which appears to be a piece of a wing, was found by employees of an association cleaning the area and handed over to the air transport brigade of the French gendarmerie (BGTA), who have opened an investigation. An air safety expert did not exclude it could be a part of the Malaysia Airlines flight MH370, which went missing in the Indian Ocean on March 8, 2014. AFP PHOTO / YANNICK PITONYANNICK PITON/AFP/Getty Images
Video: http://edition.cnn.com/2015/07/30/world/mh370-debris-investigation/  



Saint-Denis, Reunion Island (CNN)When investigators get an in-person view of a wing component that likely came from a Boeing 777, they'll be looking for not only a serial number but clues as to why the part broke off the Boeing 777.

Story highlights

  • Independent group says damage appears to indicate flaperon came off while plane was in air
  • Plane debris will be sent to investigators in France on Friday, official in Paris tells CNN
  • Investigators confident debris found on an Indian Ocean island comes from a 777 aircraft
One group of independent observers said Thursday that the damage to the component -- a right wing flaperon -- should give authorities a good indication that the piece came off while the plane was still in the air.
The group, led by American Mobile Satellite Corp. co-founder Mike Exner, points to the small amount of damage to the front of the flaperon and the ragged horizontal tear across the back.
The rear damage could have been caused if the airliner had its flaperon down as it went into the ocean, some members of Exner's group wrote in a preliminary assessment after looking at photos and videos of the component.
But the lack of damage to the front makes it more likely the plane was in a high-speed, steep, spiral descent and the part fluttered until it broke off, the group said.
Boeing and Australian officials are confident the debris -- found Wednesday off the coast of a remote island in the west Indian Ocean -- came from a Boeing 777 -- and might be from Malaysia Airlines Flight 370, a 777 that disappeared in March 2014 with 239 people on board.
The plane debris will be transported to France on Friday evening, a spokeswoman for the Paris prosecutor's office said. Agnes Thibault-Lecuivre said the piece will arrive in Paris on Saturday and will be sent to Toulouse, the site of the nearest office of the BEA, the French authority responsible for civil aviation accident investigations.
Exner's group -- an informal cadre of aviation experts -- said that if the flaperon were still on the wing when the plane hit water, the front would have been damaged by hitting the part of the wing to which it was attached. And the rear damage looks like it was caused by stress rather than being bent and broken off when the plane hit the water.
But an aircraft component specialist who spoke to CNN disagreed.
The lack of damage to the front section "tells me that the component could still have likely been back in its original position inside the wing itself," said Michael Kenney, senior vice president of Universal Asset Management, which provides plane components to airlines.

'Highly confident' component from Boeing 777

Boeing investigators are confident that debris found on a remote island in the Indian Ocean comes from a 777 aircraft, according to a source close to the investigation.
Martin Dolan, chief commissioner of the Australian Transport Safety Bureau, agreed.
"We are highly confident but it still needs confirmation that it is a part from a 777 aircraft," he told CNN's "Erin Burnett OutFront." "The only 777 aircraft that we're aware of in the Indian Ocean that could have led to this part floating is MH370. But as I said, we still need to confirm that through closer study."

EXPAND IMAGE
People cleaning a beach found the debris Wednesday on Reunion, a French overseas territory in the western Indian Ocean.
The source said Boeing investigators feel confident the piece comes from a 777 because of photos that have been analyzed and a stenciled number that corresponds to a 777 component. A component number is not the same as a part number, which is generally much longer.
Images of the debris also appear to match schematic drawings for the right wing flaperon from a Boeing 777. A flaperon helps the pilot control the aircraft. It is lightweight and has sealed chambers, making it buoyant.
Despite this confidence, no one is saying the part definitely comes from a 777, much less MH370.
Finding the debris is a "significant development" in the search for MH370, Australian Deputy Prime Minister Warren Truss said.

More debris

New debris, which washed ashore Thursday and appears to resemble remnants of a suitcase, is also part of the investigation, Reunion Island police officials confirmed to CNN.
The flight vanished March 8, 2014, en route to Beijing. So far, no confirmed trace of it has been found, making it one of history's biggest aviation mysteries and leaving relatives of passengers and crew members uncertain about the fate of their loved ones.
A preliminary assessment by U.S. intelligence agencies, produced in the wake of the MH370 disaster, suggested it was likely someone in the cockpit deliberately caused the aircraft's movements before the Malaysian airliner disappeared.
Two U.S. officials briefed on the matter told CNN that the assessment, which was not intended for public release, was prepared months ago and was solely based on available satellite and other evidence.
The U.S. intelligence assessment was largely focused on the multiple course changes the aircraft made after it deviated from its scheduled Kuala Lumpur to Beijing route. Analysts determined that, absent any other evidence, it's most likely someone in the cockpit deliberately moved the aircraft to specific waypoints, crossing Indonesian territory and eventually toward the south Indian Ocean.
Malaysian investigators haven't reported finding any evidence that casts suspicion on the pilots.
The airliner's crew has been the focus of attention since the mysterious disappearance, but no proof has emerged indicating they intended to destroy the plane. Law enforcement and intelligence agencies from numerous countries examined the plane's manifest of crew and passengers and found no significant information to suggest anyone on board posed an obvious threat.

Missing plate

If it does turn out to be from Flight 370, the development would reassure Australian officials that they are looking for the rest of the plane in the right area, Truss and Dolan said.
Airplane debris found in western Indian Ocean
Airplane debris found in western Indian Ocean 02:27
PLAY VIDEO
"It's credible that debris from MH370 could have reached the Reunion Islands by now," Truss said.
Malaysia Airlines is sending a team of investigators to Paris and a second team to Saint-Denis, Reunion, on Friday, an airline official in Kuala Lumpur, Malaysia, told CNN.
It's unclear how identification will be made.
Normally identification would be aided by a small serial number plate attached to a flaperon, but the part found on the beach appears to be missing the serial number plate, according to photographs.
Other markings may be found on the part, said Kenney, the executive from Universal Asset Management. 



Australia is leading the underwater search for the remains of Flight 370 in the southern Indian Ocean, some 2,300 nautical miles (3,700 kilometers) east of Reunion. But Truss said that French and Malaysian authorities will be responsible for establishing whether the debris found off the island came from the missing jetliner.
Australia has offered its help, he said, including asking marine experts to look at photos of the debris to determine whether barnacles on it are "consistent with something that was floating in the oceans for 16 months or more."
Video: http://english.cntv.cn/2015/07/31/VIDE1438309202518257.shtml

Related:


Malaysia is poised to escape the middle-income trap, but also ready to fall back into it. Normally the middle-income trap refers to count...

Rightways